Refine your search:     
Report No.
 - 
Search Results: Records 1-2 displayed on this page of 2
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Removal of sea salt from specimen surface using a cavitating jet in air

Hattori, Shuji*; Zhang, S.*; Yada, Hiroki; Tsukimori, Kazuyuki

Proceedings of International Symposium on Advanced Mechanical and Power Engineering 2008 (ISAMPE 2008), p.32 - 39, 2008/10

Journal Articles

Basic policy for decommissioning of nuclear power plant in Japan and the decommissioning of Fugen

Morishita, Yoshitsugu

Proceedings of International Symposium on Advanced Mechanical and Power Engineering 2008 (ISAMPE 2008), p.211 - 217, 2008/10

The basic policy for the decommissioning of the nuclear reactor in Japan was shaped in the 1990s. In the policy, it is premised that the nuclear power stations will be dismantled and removed after the safe store of the reactor from 5 to 10 years. Fugen, is the proto-type heavy water moderated, light water cooled, pressure tube type reactor with 165 MWe and has been shut downed 25 years operation. The program for decommissioning of Fugen had been prepared, and it was approved on Feb. of this year. Following the approval, we initiated to dismantle part of the facilities. It is expected that the whole decommissioning will be completed until 2028. In this paper, the basic policy for the decommissioning in Japan is outlined. The decommissioning program of FUGEN and relating R&D are also described.

2 (Records 1-2 displayed on this page)
  • 1